Oum Rbiaa – Skhour Rhamna Highway

 

Awarding authority: Highways of Morocco

Consistance of the contract: 

  • Construction Works of  Settat-Marrakech Highways
  • Section Oued Oum Rbia – Skhour Rhamna 

Total Amount: 46 271 762,50 euro

Period of the contract:  16,5 Months

Work Package B: liberating sites- Earthworks- Sewage Treatments:

  • Earthworks: fill and cut: 6 532 430 m3
  • Nozzle structures in reinforced concrete: 6 335 ml
  • All types of drains: 63 615  ml
  • Drainage, water rafting and draught excluders
  • Telecommunications pipe chase: 2 800 ml

Work Package C: pavement:

  • Sub-base: 306 800 m3
  • Substructure in GNT 0/20: 196 000 M3
  • Coating GBB+BB: 181 130 Tonnes
  • Superficial coating: 258 850 m2

Other projects on the Section Settat – Agadir

  • Settat – Oum Rabia
  • Skhour Rhamna – Benguerir
  • Benguerir Interchange
  • Chichaoua – Imintanout
  • Imintanout – Argana